Reality Rebel
Would you like to react to this message? Create an account in a few clicks or log in to continue.

Reality Rebel

Discussions of alternatives to the conventional schools of thought in philosophy, religion, politics, economics, social issues, and arts/entertainment.
 
HomeHome  PortalPortal  GalleryGallery  Latest imagesLatest images  SearchSearch  RegisterRegister  Log inLog in  

Post new topic   Reply to topicShare
 

 Handling the 7th stage physico-mind control circuitry

View previous topic View next topic Go down 
Go to page : Previous  1, 2, 3, 4, 5, 6
AuthorMessage
realikyBuilder
Admin
realikyBuilder

Posts : 1547
Points : 1703
Reputation : 6
Join date : 2015-11-07

Handling the 7th stage physico-mind control circuitry - Page 6 Empty
126PostSubject: Re: Handling the 7th stage physico-mind control circuitry   Handling the 7th stage physico-mind control circuitry - Page 6 EmptySat Sep 16, 2023 2:09 pm

Identifying and detailing 4 " balls " sub-configurations :

> The " green " balls  :
These balls are mostly spectators of their existence and rely heavily on a central cpu.
The mind control is operated remotely according to determined, routine and previsible daily pathes and communications.
The mind control is fully cpu controlled ( no link with the brain inside ).
The physical controls are robotic and mostly operated remotely but, to a limited extend, the brain can also be granted access to a physical control command mode by operators.
The senses of vision and audition are digital, cpu processed or not, and linked to the brain inside.
The senses of smell, taste and touch are canalised to the body inside.


> The " individual inside " balls  :
An whole individual living inside.
The mind control is either going from the receptor to the brain, from the receptor to the cpu, or both.
The physical controls are sent to natural movement organs and are most of the time operated remotely, but for specific purposes the brain can also be granted the right to control body movements by operators.

> The " disabled inside " balls :
An individual with a physical disability living inside.
Same as a whole individual but with robotic(s) replacing the inexistant or lost physical organ(s).

> The " personalised " balls :
Surprising variations of the 3 sub-configurations mentionned above.
Correspond to codename Zazon wickedness, for particular operational needs, or just to increase understanding difficulties.

Hyper Lady DB Ankarez for exemple has a " personalised " sub-configuration...
Back to top Go down
realikyBuilder
Admin
realikyBuilder

Posts : 1547
Points : 1703
Reputation : 6
Join date : 2015-11-07

Handling the 7th stage physico-mind control circuitry - Page 6 Empty
127PostSubject: Re: Handling the 7th stage physico-mind control circuitry   Handling the 7th stage physico-mind control circuitry - Page 6 EmptyWed Nov 01, 2023 4:40 am

During the last monthes i've been elaborating a physico-psychic Human program.
I've simply called it " Famille I " ( with " I " standing for the letter, not the number ).

I've designed it to compete with and eventually replace
the 7th stage physico-mind control softwares and hardware...

Now i feel is the right time to share it here for anyone interested in testing it,
developing it and using it freely for any good use.
Here is the actual code ( i modify it quite often but the main structure shall remain as it is now ) :

>> Program Famille I :: Fonction Elle  - Status : Loading L.exe

>  Fonction Ash : God Com and 5           - Status : Ain Si Nerf Hated

>  Fonction P    /\ Prayers 8                   - Status : Meson Table II

>  Fonction S    \/ Hyper SX Fantasies    - Status : In Charge Seeking Balance

>  Fonction A    // Evading Z Floppies     - Status : Respect Full I z


I let you guess what each fonction means except Fonction S with meaning " Skedar ".
The term Skedar is a poetic representation of individuals with a superior reptilian individual development,
providing a unique experience over reality if understood well with serious levels of security and shared confidence....


Last edited by realikyBuilder on Thu Nov 02, 2023 5:54 am; edited 4 times in total
Back to top Go down
realikyBuilder
Admin
realikyBuilder

Posts : 1547
Points : 1703
Reputation : 6
Join date : 2015-11-07

Handling the 7th stage physico-mind control circuitry - Page 6 Empty
128PostSubject: Re: Handling the 7th stage physico-mind control circuitry   Handling the 7th stage physico-mind control circuitry - Page 6 EmptyThu Nov 02, 2023 5:44 am

An important update of my Famille I program :

>> Program Famille I : Fonction Elle  - Status : Loading L.exe

>  Fonction Ash : God Com and 5       - Status : Ain Si Nerf Hated

>  Fonction P  /\ Prayers 8                  - Status : Meson Table II

>  Fonction S  \/ Hyper SX Fantasies  - Status : I Ten Dragon ° Driving z & a

>  Fonction A  // Evading Z Floppies  - Status : Respect Full I z


As i wrote the Fonction S new status above, i discovered in real time that " I Ten " sounds like the word " Heaten " !
And I feel quite pleased to post a visual of my choice for this word, instead of a definition, for the french speaking audiance :

09/02/2024 Edit : for some sensible reasons i've decided to change the Heaten photography for a simple illustration :

Handling the 7th stage physico-mind control circuitry - Page 6 Lady_f10


Last edited by realikyBuilder on Thu Feb 08, 2024 9:13 pm; edited 2 times in total
Back to top Go down
realikyBuilder
Admin
realikyBuilder

Posts : 1547
Points : 1703
Reputation : 6
Join date : 2015-11-07

Handling the 7th stage physico-mind control circuitry - Page 6 Empty
129PostSubject: Re: Handling the 7th stage physico-mind control circuitry   Handling the 7th stage physico-mind control circuitry - Page 6 EmptyMon Nov 06, 2023 10:14 pm

A slight but important modification :

>> Program Famille I : Fonction Elle  - Status : Loading L.exe

>  Fonction Ash : God Com and 5       - Status : Ain Si Nerf Hated

>  Fonction P  /\ Prayers 8                   - Status : Meson Table II

>  Fonction S  \/ Hyper SX Fantasies  - Status : I Ten Dragon ° Driving z

>  Fonction A  // Evading Z Floppies  - Status : Respect Full I z
Back to top Go down
realikyBuilder
Admin
realikyBuilder

Posts : 1547
Points : 1703
Reputation : 6
Join date : 2015-11-07

Handling the 7th stage physico-mind control circuitry - Page 6 Empty
130PostSubject: Re: Handling the 7th stage physico-mind control circuitry   Handling the 7th stage physico-mind control circuitry - Page 6 EmptyWed Nov 08, 2023 8:43 pm

New update :

>> Program Famille I : Fonction Elle  - Status : Loading L.exe

>  Fonction Ash : God Com and 5         - Status : Ain Si Nerf Hated

>  Fonction P  /\ Prayers 8                 - Status : Meson Table II

>  Fonction S  \/ Z Driving I Ten         - Status : Dragon & Famille I Mutual Protection

>  Fonction A  // Evading Z Floppies    - Status : Respect Full I z
Back to top Go down
realikyBuilder
Admin
realikyBuilder

Posts : 1547
Points : 1703
Reputation : 6
Join date : 2015-11-07

Handling the 7th stage physico-mind control circuitry - Page 6 Empty
131PostSubject: Re: Handling the 7th stage physico-mind control circuitry   Handling the 7th stage physico-mind control circuitry - Page 6 EmptyThu Nov 16, 2023 1:55 pm

Novembre 16, 2023 Update :

>> Program Famille I : Fonction Elle  - Status : L.exe Activation Step

>  Fonction Ash : God Com and 5         - Status : Ain Si Nerf Hated

>  Fonction P  /\ Prayers 8                     - Status : Meson Table II

>  Fonction S  \/ Loving I Ten             - Status : Loading Understandings

>  Fonction A  // Evading Z Floppies  - Status : Respect Full I z
Back to top Go down
realikyBuilder
Admin
realikyBuilder

Posts : 1547
Points : 1703
Reputation : 6
Join date : 2015-11-07

Handling the 7th stage physico-mind control circuitry - Page 6 Empty
132PostSubject: Re: Handling the 7th stage physico-mind control circuitry   Handling the 7th stage physico-mind control circuitry - Page 6 EmptyWed Nov 22, 2023 2:18 pm

November 22, 2023 Updates :

>> Program Famille I : Fonction Elle  - Status : L.exe Activation Step

>  Fonction Ash : God Com and 5       - Status : Upgrades Downloads

>  Fonction P  /\ Prayers 9                 - Status : Meson Table III

>  Fonction S  \/ Golden Dragon       - Status : Fully Respect Able

>  Fonction A  // U and I                   - Status : Respect Full I z
Back to top Go down
realikyBuilder
Admin
realikyBuilder

Posts : 1547
Points : 1703
Reputation : 6
Join date : 2015-11-07

Handling the 7th stage physico-mind control circuitry - Page 6 Empty
133PostSubject: Re: Handling the 7th stage physico-mind control circuitry   Handling the 7th stage physico-mind control circuitry - Page 6 EmptySun Dec 03, 2023 7:37 pm

December 04, 2023 Upgrade :

>> Program Famille I : Fonction Elle  - Status : L.exe Etape De Mises à Jour

>  Fonction Ash : God Com and 5           - Status : Upgrades Downloads

>  Fonction P  /\ Prayers 9                     - Status : Meson Table III

>  Fonction S  \/ Golden Dragon           - Status : New Leadership Research

>  Fonction A  // U and I                        - Status : Respect Full I z


This update was made after i started watching the first 35 minutes of " Project A 2 "
a visionary cinematographic work from China.
We may also increase our perceptual range by viewing the S Function " Dragon " as an established " Corporate Being " : it's really a matter of aesthetics, social and cultural preference.
Personally i found the " Golden Dragon " viewpoint more mystical compared to a corporatist view wich lets an open door to corporatism...
Furthermore the perspective of bridging Western and Eastern realities isn't bad either !

sunny elephant pig Like a Star @ heaven


Last edited by realikyBuilder on Fri Dec 15, 2023 6:20 pm; edited 6 times in total
Back to top Go down
realikyBuilder
Admin
realikyBuilder

Posts : 1547
Points : 1703
Reputation : 6
Join date : 2015-11-07

Handling the 7th stage physico-mind control circuitry - Page 6 Empty
134PostSubject: Re: Handling the 7th stage physico-mind control circuitry   Handling the 7th stage physico-mind control circuitry - Page 6 EmptyThu Dec 14, 2023 1:27 pm

December 14, 2023 Updates :

>> Program Famille I : Fonction Elle  - Status : L.exe Etape De Mises à Jour

>  Fonction Ash : Intuitive Com             - Status : Downloads and Upgrades

>  Fonction P  /\ Prayers 10                   - Status : Holy Meson Table

>  Fonction S  \/ Golden Dragon             - Status : Confidential Merits

>  Fonction A  // Goal M Golem             - Status : Working Unity
Back to top Go down
realikyBuilder
Admin
realikyBuilder

Posts : 1547
Points : 1703
Reputation : 6
Join date : 2015-11-07

Handling the 7th stage physico-mind control circuitry - Page 6 Empty
135PostSubject: Re: Handling the 7th stage physico-mind control circuitry   Handling the 7th stage physico-mind control circuitry - Page 6 EmptyFri Dec 29, 2023 7:45 pm

December 30, 2023 Updates :

>> Program Famille I : Fonction Elle  - Status : L.exe Enregistrement des Pros du 8

>  Fonction Ash : In T Huit Eve Com    - Status : Searching 4 Errors

>  Fonction P  /\ Prayers 9                   - Status : Timely Meson Table

>  Fonction S  \/ Golden Dragon          - Status : Confidential Merits

>  Fonction A  // Goal M Golem            - Status : 7th stage A vs O communautarists mind control fightings ?
Back to top Go down
realikyBuilder
Admin
realikyBuilder

Posts : 1547
Points : 1703
Reputation : 6
Join date : 2015-11-07

Handling the 7th stage physico-mind control circuitry - Page 6 Empty
136PostSubject: Re: Handling the 7th stage physico-mind control circuitry   Handling the 7th stage physico-mind control circuitry - Page 6 EmptySun Dec 31, 2023 11:42 pm

January 1st, 2024 Update :

>> Program Famille I : Fonction Elle  - Status : L.exe Enregistrement des Pros du 8

>  Fonction Ash : In T Huit Eve Com    - Status : Checks and Balance

>  Fonction P  /\ Prayers 10                 - Status : Meson Table Time

>  Fonction S  \/ Golden Dragon          - Status : Confidential Merits

>  Fonction A  // Goal M Golem            - Status : Reason and Harmony
Back to top Go down
realikyBuilder
Admin
realikyBuilder

Posts : 1547
Points : 1703
Reputation : 6
Join date : 2015-11-07

Handling the 7th stage physico-mind control circuitry - Page 6 Empty
137PostSubject: Re: Handling the 7th stage physico-mind control circuitry   Handling the 7th stage physico-mind control circuitry - Page 6 EmptySun Jan 14, 2024 3:38 pm

January 15, 2024 Progresses :

>> Program Famille I : Fonction Elle  - Status : L.exe Installation completed :
                                                                   Create an icon in the task bar ? Create a shortcut on the desktop ?

>  Fonction Ash : In T Huit Eve Com    - Status : Shielding

>  Fonction P    /\ Prayers 10               - Status : Meson Table Time

>  Fonction S    \/ Golden Dragon       - Status : Confidential Merits

>  Fonction A    // Goal M Golem         - Status : Reason and Harmony
Back to top Go down
realikyBuilder
Admin
realikyBuilder

Posts : 1547
Points : 1703
Reputation : 6
Join date : 2015-11-07

Handling the 7th stage physico-mind control circuitry - Page 6 Empty
138PostSubject: Re: Handling the 7th stage physico-mind control circuitry   Handling the 7th stage physico-mind control circuitry - Page 6 EmptyThu Feb 01, 2024 7:12 pm

February 2, 2024 Updates :

>> Program Famille I : Fonction Elle  - Status : L.exe Red D for spring !
                                                                                  Lunch program now ?

>  Fonction Ash : Was Nah Eve             - Status : Shielding Matters

>  Fonction P  /\ Action 9                      - Status : L.exe Insights

>  Fonction S  \/ Golden Dragon          - Status : Shielding Materialists

>  Fonction A  // Goal M Golem            - Status : Savory Melting Hon
Back to top Go down
realikyBuilder
Admin
realikyBuilder

Posts : 1547
Points : 1703
Reputation : 6
Join date : 2015-11-07

Handling the 7th stage physico-mind control circuitry - Page 6 Empty
139PostSubject: Re: Handling the 7th stage physico-mind control circuitry   Handling the 7th stage physico-mind control circuitry - Page 6 EmptySat Feb 24, 2024 1:51 pm

February 24, 2024 Devellopment :

>> Program Famille I : Fonction Elle  - Status : L.exe Red D for spring ! Lunching Pro Grams....

>  Fonction Ash : Was Nah Eve             - Status : Shielding Matters via Activated Sentiments / Learning Ain Cease & Hon 7

>  Fonction P  /\ Actions 9 + 1            - Status : Multi Role Defenders

>  Fonction S  \/ Golden Dragon          - Status : Shielding Materialists

>  Fonction A  // Goal M Golem           - Status : Healing Lunatic Times
Back to top Go down
Sponsored content




Handling the 7th stage physico-mind control circuitry - Page 6 Empty
140PostSubject: Re: Handling the 7th stage physico-mind control circuitry   Handling the 7th stage physico-mind control circuitry - Page 6 Empty

Back to top Go down
 
Handling the 7th stage physico-mind control circuitry
View previous topic View next topic Back to top 
Page 6 of 6Go to page : Previous  1, 2, 3, 4, 5, 6
 Similar topics
-
» 14 WiH Chapter 14: Electronic Mind Control
» 12 WiH Chapter 12: Religious Mind Control
» 24 WiH Chapter 24: The Fifth Stage of Theocracy
» A New Mind and New Eyes
» 13 WiH Chapter 13: Soul, Mind, and Consciousness

Permissions in this forum:You can reply to topics in this forum
Reality Rebel :: Discussions :: General-
Post new topic   Reply to topicJump to: